• Accurate Virtual Trial Assembly Method of Prefabricated Steel Components Using Terrestrial Laser Scanning 

      Zhou, Y.; Han, Daguang; Hu, K, etc.; Qin, Guocheng; Xiang, Zhongfu; Ying, Chunli; Zhao, Lidu; Hu, Xingyi (Advances in Civil Engineering;Volume 2021, Peer reviewed; Journal article, 2021-06-16)
      The comprehensive utilization of prefabricated components (PCs) is one of the features of industrial construction. Trial assembly is imperative for PCs used in high-rise buildings and large bridges. Virtual trial assembly ...
    • Applying BIM and 3D laser scanning technology on virtual pre-assembly for complex steel structure in construction 

      Ying, Chunli; Zhou, Yin; Han, Daguang; Qin, Guocheng; Hu, Kaixin; Guo, Jieming; Guo, Tong (IOP Conference Series: Earth and Environmental Science;Volume 371, Issue 2, Journal article; Peer reviewed, 2019)
      Steel structure needs to be assembled before the components are transported to the site to ensure the installation of the steel structure successfully. The traditional assembly is a physical assembly method, which needs ...
    • Applying BIM and 3D laser scanning technology on virtual pre-assembly for complex steel structure in construction 

      Ying, Chunli; Zhou, Yin; Han, Daguang; Qin, Guocheng; Hu, Kaixin; Guo, Jieming; Guo, Tong (IOP Conference Series: Earth and Environmental Science;371 (2019), 022036, Journal article; Peer reviewed, 2019)
      Steel structure needs to be assembled before the components are transported to the site to ensure the installation of the steel structure successfully. The traditional assembly is a physical assembly method, which needs ...
    • Automated reconstruction of parametric BIM for bridge based on terrestrial laser scanning data 

      Qin, Guocheng; Zhou, Yin; Hu, Kaixin; Han, Daguang; Ying, Chunli (Advances in Civil Engineering;Volume 2021, Journal article; Peer reviewed, 2021-01-08)
      Building information modeling (BIM) in industrialized bridge construction is usually performed based on initial design information. Differences exist between the model of the structure and its actual geometric dimensions ...
    • AUTOMATED REVERSE Modeling and examination of as-built steel truss based on point cloud data: Machine learning and bim 

      Selvakumaran, Eraikumaran (MABY;2021, Master thesis, 2021)
      Building Information Modeling (BIM) has improved the way structures are designed and constructed over the last decades. Although BIM implementation is an expected part of newer construction projects, the technology is ...
    • Automatic BIM-model creation of bridge structure using 3D-laser scanning, algorithms and parametric modeling 

      Daven, Faryad; Ezati, Shahin (MABY;2022, Master thesis, 2022)
      Bridges have a crucial and huge role in the safety of the public. An important aspect in maintaining the safety of a bridge structure is to have access to a BIM-model that can be used in analysis and facility management. ...
    • Automatic reverse modelling of box girder bridge from point cloud data 

      Knutsen, Torjus Berg; Vaksdal, Fridtjof (MABY;2020, Master thesis, 2020)
      Building Information Modelling (BIM) has over the last decades brought the physical- and digital worlds closer together. BIM implementation is now expected in construction projects, ensuring interdisciplinary cooperation ...
    • A Digital Twin predictive maintenance framework of air handling units based on automatic fault detection and diagnostics 

      Hosamo, Haidar; Svennevig, Paul Ragnar; svidt, kjeld; Han, Daguang; Nielsen, Henrik Kofoed (Energy and Buildings;Volume 261, 15 April 2022, 111988, Peer reviewed; Journal article, 2022-03-05)
      The building industry consumes the most energy globally, making it a priority in energy efficiency initiatives. Heating, ventilation, and air conditioning (HVAC) systems create the heart of buildings. Stable air handling ...
    • Experimental Study on Existing RC Circular Members Under Unequal Lateral Impact Train Collision 

      AL-Bukhaiti, Khalil; Yanhui, Liu; Shichun, Zhao; Abas, Hussein; Nan, Xu; Lang, Yang; Yu, Yan Xing; Han, Daguang (International Journal of Concrete Structures and Materials;16, Article number: 39 (2022), Peer reviewed; Journal article, 2022-07-21)
      With the fast growth of high-speed rail in recent years, derailment has become the frst hidden danger of high-speed rail transportation. The high-speed train passes near the station building. So the train may derail and ...
    • Integrating BIM and IoT for smart bridge management 

      Zhao, Zhenping; Gao, Yu; Hu, Xingyi; Zhou, Yin; Guocheng, Qin; Guo, Jieming; Liu, Yachao; Yu, Chenchen; Han, Daguang (IOP Conference Series: Earth and Environmental Science;Volume 371, Journal article; Peer reviewed, 2019)
      Considering high risk, long construction period, high construction and maintenance costs, bridge management is asynchronous, unintelligent and inefficient. The purpose of this research is to investigate a new approach with ...
    • Numerical study on existing RC circular section members under unequal impact collision 

      Yanhui, Liu; Al-Bukhaiti, Khalil; Shichun, Zhao; Abas, Hussein; Nan, Xu; Lang, Yang; Yu, Yan Xing; Han, Daguang (Scientific Reports;12, Article number: 14793 (2022), Peer reviewed; Journal article, 2022-08-30)
      Traffic accidents and derailed train-related incidents have occurred more often than ever in recent years, resulting in some economic damage and casualties. Reinforced concrete (RC) constructions often involve derailed ...